From Plan to Verified Results
- Low-carbon sourcing made traceable and contractual
- New materials tested before any switch
- Renewable electricity, packaging and logistics
- Your teams trained to run it, with evidence every year
Why Plans Stall
Many tiers
A lower-carbon source only counts if it is in the contract and proven, batch after batch.
Far away, another language
The suppliers who drive the footprint are in factories far from headquarters.
Proof every year
Customers, banks and regulators now ask for evidence, not intentions.
We are on the ground
Based in Greater China, with consultants across Asia-Pacific. We go on site and work in Mandarin, Cantonese and English.
Why Now
Reporting rules
ISSB-based rules in Hong Kong, Mainland China and Taiwan, EU Corporate Sustainability Reporting Directive (CSRD) and EU Corporate Sustainability Due Diligence Directive (CSDDD) in Europe, SB 253 in California. After a first report, Scope 3 category 1 is often still rising.
EU CBAM
In force since 2026 for aluminium, steel and other goods. Verified supplier data and lower-carbon sourcing reduce the bill.
Packaging rules
The EU PPWR since August 2026, France's AGEC law and packaging EPR: less packaging, recyclable and labelled.
Customer targets
Brands pass their Scope 3 targets on to suppliers, more and more often in contracts.
How We Deploy a Plan
- 1Kick-offMonth 1
- Workshops with your teams and key suppliers, in their language
- Owners and a written action plan
- 2Deploy the leversMonths 2 to 9
- Direct switches: same material, lower-carbon source, made traceable and contractual
- Material changes: tested first, then a go / no-go per part
- Renewable electricity: on-site solar for self-consumption, green power contracts
- Packaging and logistics: less material, reusable pallets, less air freight
- 3Team autonomyMonths 2 to 7
- Training, written procedures and monthly clinics
- Handover in three steps, until your team runs it
- 4Annual reviewMonth 8
- One evidence pack per commitment, for your customer, bank or investors
A Typical 12-Month Rollout
A typical 12-month rollout. Months count from the kick-off; dates are set with you and your suppliers.
Frequently Asked Questions
How long does deployment take?
Usually 12 months for the first wave. A direct sourcing switch, where the material stays the same, can be in place in about six months. Material changes take longer because parts are tested before any switch.
Who does the work?
Your named owners and your suppliers, with us leading and coordinating at the start. We hand over in steps: we run the first cycle, we run the second one together, and your team runs the third with our review.
What if suppliers do not follow?
The barrier is usually organisational and contractual, not technical. We meet each tier on site and in its language, compare the mechanisms that fit your purchasing leverage, and put the agreed terms into contracts and checks.
Does this help with the EU EU Carbon Border Adjustment Mechanism (CBAM)?
Yes, if you or your customers import goods covered by the Carbon Border Adjustment Mechanism (CBAM), such as aluminium or steel. Verified emissions data from your suppliers can replace the default values, which are set high, and lower-carbon sourcing reduces the certificates to buy.
How is it priced?
A fixed fee per work package, agreed upfront. Work that depends on factory schedules, such as product tests, is billed on time spent, with your approval in advance.
Tell Us What You Are Working On
A short description is enough. We reply within two working days.